Structural Design for Design and Build Contractors

On a design and build job, the contractor carries design risk. Structural design that is buildable and priced early is a major part of controlling it.
This guide shows where it adds value.
Tender stage
A structural scheme prepared before pricing lets you allow for real steel, foundation and temporary works quantities instead of guesses.
Buildable details
Details should reflect how your teams and suppliers work. Connections, bearing details and sequences that suit site practice cut errors.
Value engineering
Often a different structural arrangement achieves the same result more cheaply. This should be tested early, before drawings are issued for construction.
Coordination with other designers
Structural design needs to be coordinated with architectural, services and temporary works information. Clash checks before issue prevent site problems.
Handover information
Final drawings, calculations and records are needed for Building Control and for the client. Gather them as you go rather than at the end.
Related guides: Structural engineering and project management together, What construction project management consultancy involves, Managing building control approvals, all our guides.
Talk to Graal
Working on a project anywhere in London and need structural input? Graal Structural Engineering supports contractors, developers and architects with structural design, calculations, temporary works design and project management. Call 07737188754 or send your drawings through our contact form and we will come back to you with what is needed and how long it is likely to take.





Comments