Structure is often the least visible and most variable cost in a refurbishment or extension. Pricing it by guesswork leads to margin problems later.

Early engineering input fixes that.

What can be firmed up

Beam sizes, foundation types and temporary works can all be estimated far more accurately from a short structural review than from a general allowance.

Fewer provisional sums

Where the structure is unknown, a provisional sum is the usual answer. A survey and outline design can replace many of them with real figures.

Identifying risks

Poor ground, weak existing walls and neighbouring structures all affect cost. Knowing about them before pricing is cheaper than finding them on site.

Programme effects

Steel lead times, needing temporary works designs and Building Control timing can all be built into the tender programme.

Making the tender comparable

If every bidder prices from the same structural information, the comparison is fair and the winner is less likely to ask for extras.

Talk to Graal

Working on a project anywhere in London and need structural input? Graal Structural Engineering supports contractors, developers and architects with structural design, calculations, temporary works design and project management. Call 07737188754 or send your drawings through our contact form and we will come back to you with what is needed and how long it is likely to take.