top of page

Building Control Submissions for London Contractors

Writer: Daniel Nikolla
Daniel Nikolla
Oct 28
1 min read

Building Control approval is a legal requirement for most structural work. Slow approvals usually trace back to incomplete submissions.

Here is what to prepare.

What is normally required

Drawings, structural calculations and specification information for the elements being altered or built, along with the standard application forms.

Choose your route

You can use the local authority or a registered approved inspector. Both check compliance with the Building Regulations.

Answering queries quickly

Inspectors may ask for clarification. Quick replies, ideally with the engineer's input, keep the programme moving.

Inspection stages

Give notice before foundations, structural steel and anything else that will be covered. Do not cover work before it has been inspected.

Keep your records

The completion certificate and supporting documents are needed for sale or remortgage and by many clients at handover.

Talk to Graal

Working on a project anywhere in London and need structural input? Graal Structural Engineering supports contractors, developers and architects with structural design, calculations, temporary works design and project management. Call 07737188754 or send your drawings through our contact form and we will come back to you with what is needed and how long it is likely to take.

Comments


bottom of page
Merx Marketing