BS 5975 Temporary Works Explained for Contractors

Writer: Daniel Nikolla
Daniel Nikolla
Oct 28
2 min read

BS 5975 is the British Standard code of practice for temporary works procedures and the permissible stress design of falsework. Many main contractors and clients expect it to be followed.

This is a general overview and does not replace reading the standard itself.

The temporary works coordinator

The standard expects one person to coordinate temporary works on a project. They keep a register, make sure designs are checked and make sure work is installed and removed in a controlled way.

Design and check

Temporary works designs are prepared by a competent designer and, depending on complexity, checked by someone independent. The higher the risk, the more independence the check needs.

Permit to load and permit to strike

Before a temporary structure is loaded, it is inspected and a permit is issued. Before it is removed, a permit to strike confirms the permanent structure can carry the load. These controls stop work being loaded or struck too early.

Records

Keep the register, designs, checks and permits together. They are the evidence that the procedure was followed and are often requested at handover or after an incident.

Making it proportionate

Procedures should match the risk. A simple prop arrangement on a small job needs less paperwork than a complex shoring scheme, but each still needs a design, a check and a controlled removal.

Talk to Graal

Working on a project anywhere in London and need structural input? Graal Structural Engineering supports contractors, developers and architects with structural design, calculations, temporary works design and project management. Call 07737188754 or send your drawings through our contact form and we will come back to you with what is needed and how long it is likely to take.

Comments


bottom of page
Merx Marketing