BS 5975 Temporary Works Explained for Contractors

BS 5975 is the British Standard code of practice for temporary works procedures and the permissible stress design of falsework. Many main contractors and clients expect it to be followed.
This is a general overview and does not replace reading the standard itself.
The temporary works coordinator
The standard expects one person to coordinate temporary works on a project. They keep a register, make sure designs are checked and make sure work is installed and removed in a controlled way.
Design and check
Temporary works designs are prepared by a competent designer and, depending on complexity, checked by someone independent. The higher the risk, the more independence the check needs.
Permit to load and permit to strike
Before a temporary structure is loaded, it is inspected and a permit is issued. Before it is removed, a permit to strike confirms the permanent structure can carry the load. These controls stop work being loaded or struck too early.
Records
Keep the register, designs, checks and permits together. They are the evidence that the procedure was followed and are often requested at handover or after an incident.
Making it proportionate
Procedures should match the risk. A simple prop arrangement on a small job needs less paperwork than a complex shoring scheme, but each still needs a design, a check and a controlled removal.
Related guides: Structural engineering and project management together, What construction project management consultancy involves, Managing building control approvals, all our guides.
Talk to Graal
Working on a project anywhere in London and need structural input? Graal Structural Engineering supports contractors, developers and architects with structural design, calculations, temporary works design and project management. Call 07737188754 or send your drawings through our contact form and we will come back to you with what is needed and how long it is likely to take.





Comments